Inference systems for grid operators
NERC CIP-aware load forecasting, FERC Order 2222 DER aggregation, AGC reserve optimisation, and PSPS decision support - built against DNP3, IEC 61850, AVEVA PI, and ISO/RTO market interfaces.
What you get
Inference systems we ship for utilities & ISO/RTOs
Production models for IOUs, munis and co-ops, ISO/RTO operators, IPPs, BESS aggregators, EV charging operators, and upstream/midstream oil and gas.
Short-term load & net-load forecasting
15-minute, 1-hour, and day-ahead horizons. Sub-3% MAPE day-ahead on system load. Net-load models account for behind-the-meter solar and EV charging.
Predictive maintenance on rotating & static assets
Transformer DGA models, gas-turbine vibration and exhaust-gas-temperature anomaly detection, wind-blade pitch-bearing degradation - fed from AVEVA PI tag streams.
AGC reserve & regulation optimisation
Net-load volatility forecasts that right-size regulation reserve, and learned dispatch factors that route AGC signals to units most likely to respond.
DER orchestration & demand response
FERC Order 2222 aggregation, OpenADR 2.0b dispatch, IEEE 1547-2018-compliant smart-inverter setpoints, distribution-power-flow constraints via OpenDSS or GridLAB-D.
Wildfire-PSPS decision support
Hourly circuit-level hazard score out 72 hours. Inputs: HRRR/NAM/ECMWF weather, LFM satellite vegetation moisture, CAL FIRE history, asset-age inventory, micrometeorological sensors.
Settlements automation across ISO/RTOs
Shadow settlement against PJM eMKT, CAISO OASIS, ERCOT MIS files. Variance detection, auto-filled dispute templates, resettlement tracking at 10 / 55 / 180 days.
Platforms, historians, and AMI we integrate against
Data engineering for OT-safe AI
Pipelines that survive a NERC CIP audit and a 4 a.m. storm-restoration event with equal grace.
AMI & smart-meter ingestion
Itron, Landis+Gyr, Aclara, Sensus head-end systems
MultiSpeak and MDM extracts into a typed event stream
Interval-data reconciliation against CIS billing
Voltage/VAR analytics for ANSI C84.1 band breaches
Theft and non-technical-loss anomaly scoring
SCADA & substation telemetry pipelines
DNP3, IEC 61850, IEC 60870-5-104, ICCP / TASE.2
Read-only taps off the EMS / DMS / ADMS without expanding the ESP
62443-3-3 conduits between OT and IT (data diode or vetted FTA)
GE Vernova ADMS, Schneider EcoStruxure Grid, Siemens Spectrum Power adapters
Tag normalisation against IEC 61850 logical-node schema
AVEVA PI to lakehouse
Historian replication that does not destabilise the Data Archive
PI Integrator for Business Analytics or PI to PI replication
Asset Framework (AF) templates become the lakehouse schema
1-minute, 15-minute, hourly rollups pre-computed
Parquet/Delta on customer-owned S3, ADLS, or GCS
IEC 62443-aligned segmentation, NERC CIP-aware evidence
Models train on the IT side; trained artefacts cross into the OT zone through a documented 62443-3-3 conduit. The inference host runs as a registered BES Cyber Asset under the same CIP-005, CIP-007, CIP-010, and CIP-011 controls as the rest of your EMS estate - auditors see one more BCA, not a new architecture.
Engineering Q&A
The questions utility ops, EMS engineers, and ISO/RTO market teams actually ask before signing off.
Bring your CIP-aware AI workload to a team that has shipped one.
Talk to an engineer who has read NERC CIP-005, integrated against AVEVA PI, and submitted bids into PJM and CAISO. Bring your EMS vendor, your historian, and your ISO. We will show you what is real and what is not.