Construction & Real Estate AI

Field-grade AI for GCs & Trades

RFI auto-triage on Procore and ACC, IFC/Revit-native quantity takeoff, OSHA-aware safety vision, and schedule-risk forecasting from daily reports.

RFI cycle time: 14–21 days baseline to 24–72 hours with RAG-grounded triage
IFC4 / IFC2x3 takeoff via IfcOpenShell and Autodesk Platform Services (Forge)
Edge-deployed safety vision with TRIR + OSHA Form 300 telemetry
Procore + ACC + Bluebeam-native

What You Get

Inference Systems
RFI auto-triage grounded in your spec library + prior RFI corpus
IFC / Revit takeoff with element-GUID variance vs prior revision
Edge safety vision on Jetson / AWS Panorama, raw video stays onsite
Platforms Wired
ProcoreAutodesk ACCRevit / IFCBluebeamTrimbleSage 300 CRE
Cognilium Track Record
50+
Projects delivered
96%
Client satisfaction
2019
Founded

Inference Systems for Construction

Real platforms (Procore, ACC, Bluebeam, Trimble), real protocols (IFC4, COBie, Forge API), real metrics (TRIR, SPI, RFI cycle time) - built on your project data, not a generic crawl.

RFI Auto-Triage (Procore + ACC)

RAG-grounded answer suggestion over your specs, drawings, and prior RFI threads - pulled from Procore and Autodesk Construction Cloud via the Forge Data Management API. Every suggestion cites the exact spec section, sheet, and revision.

Submittal Review Automation

PDF field extraction against the project manual: manufacturer vs approved list, performance values vs spec minima, ASTM / UL references vs required standards. Output is a Bluebeam Revu markup ready for the architect.

Punch-List Image Recognition

Defect classification against ACC and BIM 360 jobsite photos. Detects missing trim, finish defects, mechanical clearance violations and codes them to CSI MasterFormat divisions for the closeout walkthrough.

Schedule-Risk Forecasting

Ingest P6 XER/XML or MS Project MPP, join daily reports, sub progress, and weather per-activity. Gradient-boosted survival model outputs Schedule Performance Index trajectory and a ranked list of activities driving the slip.

Quantity Takeoff (IFC / Revit)

IFC4 and IFC2x3 takeoff via IfcOpenShell and Autodesk Platform Services Model Derivative. Variance vs prior revision reported per element-GUID - estimators see exactly what changed between drawing issues.

OSHA-Aware Safety Vision

Edge inference on NVIDIA Jetson or AWS Panorama at the trailer - raw video never leaves the jobsite. PPE and 29 CFR 1926 hazard classes feed TRIR (per 200,000 hours) and Form 300 / 300A / 301 recordable workflows.

Equipment-Utilisation Optimisation

Cross-jobsite fleet model that joins telematics with the look-ahead schedule. Highlights underused machines (low-hours / no-fuel-burn days) and surfaces Section 179 / Section 168(k) reallocation candidates.

Built for

ENR Top 400 GCs
Specialty trades (MEP, steel, glazing, drywall)
AEC firms
Owner's reps

Data Infrastructure Capabilities

The pipes that make construction AI possible - BIM-native, vendor-spanning, jobsite-edge-aware.

BIM Pipeline: IFC4, COBie, Forge

Open and vendor-native BIM ingest with element-GUID lineage end-to-end

IFC4 / IFC2x3 ingest via IfcOpenShell with per-element provenance

Autodesk Platform Services (Forge) Model Derivative + Data Management

Revit / Navisworks property and geometry extraction to columnar store

Clash issues round-tripped to BIM Collaborate Pro and ACC Issues

COBie 2.4 export for facility handover at substantial completion

glTF preview tiles for web-based jobsite review

Project Data Fabric: Procore, ACC, Sage 300 CRE

Unified document, RFI, submittal, cost and schedule layer across vendors

Procore REST + Webhooks for documents, RFIs, submittals, daily reports

Autodesk Construction Cloud + BIM 360 via Forge

Bluebeam Studio Prime markup and session ingest

Sage 100 / 300 Construction & Real Estate cost and GL sync

Primavera P6 (XER / XML) and MS Project (MPP) baseline parsing

Schedule Performance Index telemetry per WBS rollup

Field & Supply Chain Telemetry

Edge-aware data plane wiring jobsite hardware to the back office

Telematics ingest from mixed fleets (Caterpillar VisionLink, Komatsu KOMTRAX, JDLink)

Trimble Connect / Vista / Spectrum project, equipment and job-cost feeds

Edge inference on NVIDIA Jetson / AWS Panorama with offline buffering

Material RFID / barcode scanning to PO and submittal reconciliation

Daily-report NLP wired to OSHA recordable categories and TRIR

Weather + crew + activity join for schedule-risk features

Deployed in your VPC, not ours

Reference deployments on AWS, Azure and GCP with customer-managed KMS keys. Project documents stay inside your tenant. Edge nodes at jobsite trailers buffer offline and reconcile when connectivity returns - superintendents do not wait on a cell signal to file a daily report.

Frequently Asked Questions

Real platforms, real protocols, real regulations - what GCs and AEC engineering teams actually ask before they buy.

Get an engineer on your Procore, ACC and IFC stack

Walk us through the seams between your project management, design coordination, markup and cost systems - we'll show you exactly where RFI triage, takeoff and safety vision plug in.

50+
Projects delivered
96%
Client satisfaction
US · UAE · PK
Clients served since 2019